|

This basement project in Beaulieu was installed below a new build boat
house to accommodate pumping equipment. 14 Driven piles were installed
to a depth of 12 meters with a reinforced slab on top. The reinforced concrete walls were formed
on top using specialist shuttering and Everdure caltite to produce a
water tight finish.
|