We believe one of the most important things to consider when choosing a contractor is their experience. Below is a small cross-section of some of our more recent contracts showing the breadth of work we undertake.
More detailed information, including photos, is available for each project by clicking on it.
-
Children’s and Community Centre, Wimborne
A new children's and community centre that required 70 driven piles in three days.
-
Rollercoaster, Thorpe Park
470 piles for a new theme park attraction called "Saw".
-
Premier Inn, Weymouth
92 steel cased driven piles for a hotelier.
-
Parkstone Bay Marina
Plastic sheet piling and slabs for works near Poole Harbour.
-
Bandstand, Farnham
8 steel cased driven piles and reinforced beams for a unique structure.
-
Basement, Lambourne
A two room, waterproof basement project.
-
Richmond Basement
A basement project using sheet piling.
-
Wooden Walls, Beaulieu
67 piles and 460m² reinforced slab.
-
Marlborough Basement / Garden Room
Implementation of a Caltite waterproof concrete system.
-
Kings Road, Swanage
66 steel cased driven piles required for new apartments in development.
-
Kingpost Wall, Poole
A new build that required a reinforced retaining wall to hold back loose sand, including reinforced ground beams.
-
Extension, Milton Keynes
A small domestic extension that required ten piles and reinforced beams.
-
Extension, Weymouth
A small extension that used six piles, as well as pre-bore for anti heave protection.
-
Substation, Southsea
A new transformer unit that required 25 steel-cased driven piles, working around pre-existing high-voltage equipment.
-
East Horsley, Surrey
A new, large domestic build using 26 augered piles and reinforced ground beams with anti-heave protection.
-
Marina Drive, Poole
Poor ground conditions mitigated with four piles, reinforced beams and concrete slabs.
-
CFA Contiguous Wall, Poole
A large, new domestic build requiring 66 CFA piles.
-
Basement, Beaulieu
Waterproof basement and 14 driven piles.
-
CFA Retaining Wall, Poole
A 20 pile installation.
-
New House Plots, Wimborne
Two new developments that used 52 driven piles and RC Beams on a split-level site.
-
New Build Plot, Horndean
25 augured piles required due to chalk soil.
-
Kingstag, Dorset
Renovation to existing outbuildings with twelve driven piles.
-
Extension, Kingsettle Semley
An extension that used ten augered piles and reinforced ground beams.
-
New Build, Petersfield
20 driven piles for a new house.
-
Kings Road, Swanage
86 CFA piles for a new build.
-
Kingsman Lane, Shaftesbury
32 sheet piles and a retaining wall.
-
Marlow Piles
Piling with reinforced ground beams for a small extension with difficult access that required minipiling.
-
Linwood
Eight piles and reinforced ground beams for construction in the New Forest.
-
Bristol Extension
Six piles and reinforced ground beams for an extension.
-
Marlborough
Creation of a sheet pile retaining wall.
-
Waltham Chase
34 driven piles and ground beams for a new build.
