Beaulieu Basement
This basement project in Beaulieu was installed below a new build boat house to accommodate pumping equipment. 14 Driven piles were installed to a depth of 12 meters with a reinforced slab on top. The reinforced concrete walls were formed on top using specialist shuttering and Everdure caltite to produce a water tight finish.
