Modern New Build House
Wooden walls project at Beaulieu located on the edge of
Beaulieu river consisted of 67
273mm steel cased driven piles to a depth of 12 meters with
compression loads of 325kn and lateral loads of 25kn. We worked very closely
with the developer and client to achieve an impressive foundation
solution for this project. The Cordek anti heave protection system was
used across the entire slab to protect against possible ground heave
conditions and the final reinforced slab measured 460m2 and was 275mm
thick.
The two out buildings required a further 25 piles and
Cordek anti heave protection followed by the main slabs.
All works completed within the given time frame of June
2009.
|